Upward Extensions Permitted Development: Adding Storeys to Houses (2025)
Part 20 of the GPDO permits one or two additional storeys on houses and commercial buildings with Prior Approval. Here’s how Class AA, Class A, and the commercial classes work.
Quick Answer
Part 20 permits additional storeys on homes and commercial buildings — with Prior Approval
Part 20 of the GPDO 2015 contains a set of permitted development rights for upward extensions — adding one or two additional storeys to existing buildings. These rights were introduced in 2020 to support gentle densification of urban areas. The main classes are: Class A (upward extensions on detached houses), Class AA (upward extensions on terrace and semi-detached houses), and Classes A–AC for commercial buildings. All Part 20 upward extension rights require Prior Approval. The new storeys must be used for residential purposes.
What Part 20 Covers
Part 20 of Schedule 2 to the GPDO 2015 (as amended) contains permitted development rights for upward extensions. The key classes are:
| Class | What It Covers |
|---|---|
| Class A | One or two additional storeys on a detached dwellinghouse to create new dwellings |
| Class AA | One additional storey on a terrace or semi-detached house to enlarge the existing dwelling |
| Class AB | Additional storeys on a terrace of commercial buildings for residential use |
| Class AC | Additional storeys on a detached commercial building for residential use |
| Class AD | Additional storeys on a flat-roofed building (hotel, hospital, or residential block) |
| Class ZA | Demolish and rebuild — covered in a separate guide |
The most commonly used rights are Class AA (upward extension of a semi or terrace to enlarge the existing house — e.g. adding a new top floor bedroom) and Classes AB/AC (adding residential storeys on top of shops and offices).
Class AA: Adding a Storey to a House
Class AA permits the addition of one storey to a terrace house or semi-detached house to enlarge the existing dwellinghouse. The key rules:
| Condition | Detail |
|---|---|
| Number of storeys added | Maximum one additional storey |
| Resulting height | The additional storey must not result in the building exceeding the height of the next tallest building in the terrace, or (for semi-detached) the height of the adjoined building |
| Roof pitch | The new storey must be within a mansard-style roof, or with the same roof pitch as the existing roof |
| Use | The additional storey must be used as part of the existing dwelling — it cannot create a new separate dwelling |
| Floor space | No floor space restriction on Class AA |
| Listed buildings | Class AA does not apply to listed buildings |
Prior Approval for Part 20 Extensions
All Part 20 upward extension rights require Prior Approval. The council has 56 days to determine the application. For Class AA (house enlargement), the council can consider:
- Impact on the appearance of the existing building
- Impact on the amenity of neighbouring premises (natural light, privacy)
- Air traffic and defence concerns
- Impact on protected views
- Whether the extension would be out of keeping with the building and the street
For Classes AB/AC (commercial buildings with new residential storeys), the council can additionally consider transport and highway impacts, flooding, contamination, and noise.
Mansard Roof Extensions and Part 20
A mansard roof extension — where a flat roof is converted to a pitched mansard roof with dormer windows on all four sides — can be a route to adding a storey to a terrace or semi-detached house. Class AA permits this approach under Part 20.
In London, mansard roofs are particularly associated with the Victorian terrace building typology. Many London councils have Article 4 Directions or Supplementary Planning Documents specifying the design requirements for mansard extensions in their area, even for Prior Approval applications.
For houses outside the application of Class AA (e.g. detached houses not using Class A, or where Class AA conditions aren’t met), a full planning application may be needed for a mansard extension if it goes beyond the Part 1 Class B dormer allowance.
Frequently Asked Questions
More on Permitted Development Rights
Extensions, loft conversions, outbuildings, solar panels — our complete guide covers everything you can build without planning permission.
