Apple Pay

Dropped Kerb Planning Permission: How to Get One (2025)

Dropped Kerb Planning Permission: How to Get One (2025)

Planning Rules

Dropped Kerb Planning Permission: How to Get One (2025)

A dropped kerb lets you cross the pavement to access a driveway. You don’t just need planning permission — you need separate approval from the highways authority. Here’s the full process.

What is a Dropped Kerb?

A dropped kerb (also called a vehicle crossover or vehicular access) is where the kerb between the road and pavement is lowered to allow vehicles to drive over it onto a driveway. It also usually involves raising the level of the pavement or installing a hardened crossing surface to take vehicle loads.

Dropped kerbs are essential for any driveway that requires vehicles to cross a pavement. Driving over a normal kerb is illegal and can damage both the kerb and vehicle.

Do You Need Permission?

Yes. A dropped kerb always requires permission from the local highways authority — regardless of whether your driveway needs planning permission. This is because the highway (including the pavement) is public land maintained by the council.

Two Separate Processes

You may need both highways authority approval (for the dropped kerb) and planning permission (for the driveway itself if non-permeable over 5m²). These are entirely separate applications to different departments within the council.

In some areas, the council also requires a separate planning application for a vehicle crossover before they will approve the highways works. Check with your local authority — requirements vary.

The Highways Authority Application Process

The application process typically works as follows:

  1. Apply online through your council’s website. You’ll need the address, details of the proposed access, and usually a site plan.
  2. Assessment. The highways authority will assess the application for sight lines, proximity to junctions (crossovers within 10m of a junction are often refused), road safety, and impact on existing street infrastructure.
  3. Approval or refusal. If approved, the council will carry out the works themselves or approve your use of a council-approved contractor.
  4. Works carried out. The actual installation is done by the council or their approved contractor.
⚠️ Only Use Approved Contractors You cannot install a dropped kerb yourself, and you cannot use an unapproved contractor. The highway is public land and only the council or their approved contractors can carry out these works legally.

Planning Permission vs Highways Approval

Approval Type Who Grants It What It Covers
Highways approval Local highways authority The dropped kerb and vehicle crossover on public highway
Planning permission Local planning authority The driveway itself on your private land (only if non-permeable over 5m²)

How Much Does a Dropped Kerb Cost?

Element Typical Cost
Application fee Free – £250 depending on council
Council installation (standard single crossover) £1,000 – £2,000
Council installation (wider or complex crossover) £2,000 – £4,000
Reinstatement of existing crossover £500 – £1,500
✅ London Premium London borough councils often charge significantly more for dropped kerbs — sometimes £3,000–£5,000 — due to higher labour costs and more complex street infrastructure.

When Applications Are Refused

Common grounds for refusal: within 10m of a road junction; poor sight lines; classified road; pavement too narrow; insufficient space on property to park clear of pavement. If refused, you can appeal or modify the proposal.

Illegal Dropped Kerbs

An illegal dropped kerb is one installed without highways authority approval. If you have an existing unapproved crossover, you may be required to reinstate the kerb at your own expense. The council can also issue an enforcement notice. Check approval status when buying a property.

Frequently Asked Questions

How long does a dropped kerb application take?
Most councils process applications within 4–8 weeks. Total time from application to completed works is typically 3–6 months.
Can I use my own contractor for a dropped kerb?
Generally no — the highways authority carries out the works or only permits council-approved contractors. Some councils allow approved private contractors under a Section 50 licence.
Do I need a dropped kerb to park in my front garden?
If there is no existing dropped kerb and you need to drive over the pavement, yes. Driving over an undropped kerb is illegal.

More on Permitted Development Rights

Extensions, loft conversions, outbuildings, solar panels — our complete guide covers everything you can build without planning permission.

Read the Complete PD Guide →

Share This :

Maximize your property’s footprint with precision and ease. Permitted provides complete design for Permitted Development Rights, ensuring your project meets all national requirements while bypassing the lengthy full planning permission process.