Fixed pricePre-designed packagesEmailed after paymentFixed price
Part ofYPDS

Permitted Development drawings

See what you could build without a planning application.

Professional, builder-ready drawing packages for extensions, lofts, porches, garages, garden rooms and more — designed to Permitted Development parameters and supplied as sold.


PERMITTED HOMEOWNER GUIDES

Planning a home project?
Start with a £15 guide.

Our illustrated, practical guides help you understand the rules, explore design options and budget with confidence — before you commit to building work.

  • Porch Guide — £15 illustrated PDF guide by PERMITTED
    Porch Guide

    Rules, design options, costs and next steps.

    View guide
  • Garage Guide — £15 illustrated PDF guide by PERMITTED
    Garage Guide

    Rules, design options, costs and next steps.

    View guide
  • Garden Room Guide — £15 illustrated PDF guide by PERMITTED
    Garden Room Guide

    Rules, design options, costs and next steps.

    View guide
  • Rear Extension Guide — £15 illustrated PDF guide by PERMITTED
    Rear Extension Guide

    Rules, design options, costs and next steps.

    View guide
  • Side Extension Guide — £15 illustrated PDF guide by PERMITTED
    Side Extension Guide

    Rules, design options, costs and next steps.

    View guide
  • Conservatory Guide — £15 illustrated PDF guide by PERMITTED
    Conservatory Guide

    Rules, design options, costs and next steps.

    View guide
  • Two Storey Rear Guide — £15 illustrated PDF guide by PERMITTED
    Two Storey Rear Guide

    Rules, design options, costs and next steps.

    View guide
  • Loft Conversion Guide — £15 illustrated PDF guide by PERMITTED
    Loft Conversion Guide

    Rules, design options, costs and next steps.

    View guide
8 project-specific guidesClear, jargon-free explanations£15 off matching drawing packages

Two storey rear extension in brick with bi-fold doors
Two-storey rear extensions

A bigger home.
For the long term.

A two-storey rear extension can significantly increase your living space, allowing for a larger kitchen, additional living space and extra bedrooms — without a normal planning application if it meets the Permitted Development (PD) rules.

Check your property

See what you could build at your home and choose the right drawing package.

The key PD rules.

Two-storey rear extensions fall under Class A of the Permitted Development Order. The main limits are set by how far the extension projects from the original house, its height and overall size, with additional rules for terraced and semi-detached houses.

See all the rules

The important bit:

Your two-storey rear extension must comply with all of the relevant PD rules. If any single limit is exceeded, a normal planning application may be required.

How far can it extend?

A rear extension of more than one storey can project up to 3 metres beyond the rear wall of the original house. That limit is the same for a terraced, semi-detached or detached house — there is no difference by house type.

It must also not sit within 7 metres of the boundary opposite the rear wall of the house being enlarged.

3 metresMaximum projection beyond the original rear wall, for every house type.
7 metresMinimum distance from the extension to the boundary opposite the rear wall.
Two-storey rear extensions: maximum 3 metres deep for terraced, semi-detached and detached houses

How high can it be?

The extension must not be higher than the highest part of the roof of the existing house, and its eaves must not be higher than the eaves of the existing house. Within 2 metres of a boundary, eaves must not exceed 3 metres.

Two-storey rear extension: maximum 3 metres beyond the original rear wall and at least 7 metres to the rear boundary

How wide can it be?

The extension must not be wider than the original house.

Two-storey rear extension: maximum 3 metres beyond the original rear wall and at least 7 metres to the rear boundary

Materials and appearance.

The roof form should normally be similar in appearance to the existing house, and the materials used should be of a similar appearance to the existing house.

Materials and appearance

Other important limits.

  • Must be to the rear of the original house.
  • Maximum projection of 3 metres, whatever the house type.
  • Must not be within 7 metres of the boundary opposite the rear wall.
  • Must not be higher than the highest part of the existing roof.
  • Eaves must not exceed 3 metres within 2 metres of a boundary.
  • Not permitted on article 2(3) land, where a rear extension of more than one storey falls outside Permitted Development.

Real example.

A two-storey rear extension providing a larger kitchen, living space and additional bedrooms — built within PD limits.

A two-storey rear extension providing a larger kitchen, living space and additional bedrooms — built within PD limits.

The drawing package for this work

A complete, builder-ready set of drawings supplied exactly as sold.

Two Storey Rear drawing packageTwo Storey RearView the drawing package

More Permitted Development guidance

All Permitted Development guidance

See what you could build
at your property.

We will check your property, apply the relevant Permitted Development rules and help you configure the right design and drawing package for your home.

Check your property

How it works
01Enter your
postcode
02See what you
can build
03Configure
your design
04Get your
drawings

Permitted Development rights described on this page apply to houses in England under the Town and Country Planning (General Permitted Development) (England) Order 2015. Different planning rules apply in Scotland, Wales and Northern Ireland. This page is general guidance, not a formal planning determination — always check your own property and, where you need certainty, apply to your local planning authority for a Lawful Development Certificate.

Maximize your property’s footprint with precision and ease. Permitted provides complete design for Permitted Development Rights. Our packages are designed around the Permitted Development limits, so many projects can proceed without a full planning application.